21 Aug

North Yorkshire County Council has informed the Parish Council that Wood Hall Bridge repairs should be completed in December. Originally NYCC were stating an earlier date but blamed the tender process for slowing things down.

The Parish Council hopes repairs will allow the bridge to reopen for Christmas as the bridge has been a populr walkers and cyclists route between East Keswick and Sicklinghall.

ADVERTISING SPACE
(220 x 150 pixels)

ADVERTISING SPACE
(220 x 150 pixels)

ADVERTISING SPACE
(220 x 150 pixels)

ADVERTISING SPACE
(452 x 150 pixels)

ADVERTISING SPACE
(220 x 150 pixels)